Kilkenny Local Authorities made a decision to purchase the site of the brewery from Diageo. The overall site which measures approx. 19 acreas was purchased with a view to job creation and the development of public amenity areas on the site. The objective for the site was “to develop a new low carbon energy strategy for the masterplan and to advance the provision of near zero energy buildings on site”.
Our energy strategy produced innovative and cost effective design solutions especially in regard to renewable technology, these included:-
Solar Photovoltaic Installs
Hydro
Bio-Energy Lid
Centralised Heat and Power (CHP)
Public Lighting
Demand Side Management
Renewable Heat Sources
District Heating Network
Ventilation
Energy / Heat Strategy for Individual Buildings
Our strategy also contained the evaluation of each of our proposed options in the context of site restrictions which include Archtectural Conservation Area, Special Area of Conservation and Special Protection Area and also Flood Risk Assessment.